Super Suction SA logo
EnvelopeFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)

Email

Phone

Map Marker-altFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)

31 Farrow Circuit, Seaford, SA 5169

Phone VolumeFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)

PROJECTS

Super Suction SA Torrens Road to River Torrens Project – CPB Contractors JV/Aurecon
Super Suction SA Torrens Road to River Torrens Project – CPB Contractors JV/Aurecon

Torrens Road to River Torrens Project – CPB Contractors JV/Aurecon

Super Suction SA were chosen as a preferred supplier to deliver Hydro Excavation Services on the Torrens Road to River Torrens project, a key link in Adelaide’s program for upgrading the north‐south corridor and transport network.

The project included Construction of a 3km section of non‐stop road between Torrens Road in Ridleyton and Ashwin Parade in Torrensville; and A 2km section of lowered motorway set approximately eight metres below the existing surface of South Road, providing three lanes in each direction.

The Torrens Road to River Torrens Project has a total value of approximately $896 million and is jointly funded by the South Australian and Australian government.


The concept design includes:

  • A 4 kilometre non-stop section of roadway (incorporating a lowered road section) ​
  • A 3 kilometre section of lowered non-stop motorway 
  • An overpass of the Outer Harbor railway line
  • Improved cycling and pedestrian facilities
  • Landscaping and noise barriers (where required).

NBN South Australia – Fulton Hogan

Super Suction SA were chosen as the preferred supplier to deliver hydro excavation on the rollout of Fibre Servicing Area Modules for the National Broadband Network (NBN) across Adelaide. Works involve trenching and boring along suburban streets to allow for hauling or laying of high-speed fibre optic cable and associated works for either an aerial or underground lead-in cable to connect residents to the NBN.


As of December 2017 works involved approximately 163km of trenching including 20km of directional drilling, installation of 4,827 pits and laying of 776km of fibre cable, 521km of copper cable, 59km of coaxial cable and 1,040 cabinets.

Super Suction Fulton Hogan - NBN Roll out Project
Super Suction SA Obahn City Access Project – McConnell Dowell

Obahn City Access Project – McConnell Dowell

Super Suction SA was chosen as the preferred supplier to deliver Hydro Excavation Services on the $160M O-Bahn City Access Project aimed at improving travel times and reliability and reducing traffic congestion and delays.


The project extends the O-Bahn system from the end of the busway at Gilberton into the cross-city priority bus lanes on Grenfell Street, and included the creation of centrally aligned priority bus lanes along Hackney Road and a dedicated 670 metre bus tunnel providing quicker, more reliable access for O-Bahn buses into the city.

© 2020 Super Suction SA

|

Fill out the form below and you will recieve a free quote shortly. Or call 0417 393 188